Enhancing Power Generation Efficiency: A Success Story in Indonesia's Coal Fired Power Sector
By upgrading Power Plant UBJOM PLTU Rembang's Main Boiler Feed Pump (MBFP), we implemented a reliable backup solution in case of turbine issues, preventing potential plant shutdowns. Additionally, with the upgraded pump serving as a backup for the Boiler Feed Pump Turbine (BFPT), the coal-fired power plant unit can maintain its power output without experiencing any derating, further demonstrating the reliability and effectiveness of our pump upgrades.
By upgrading Power Plant UBJOM PLTU Rembang's Main Boiler Feed Pump (MBFP), we implemented a reliable backup solution in case of turbine issues, preventing potential plant shutdowns. Additionally, with the upgraded pump serving as a backup for the Boiler Feed Pump Turbine (BFPT), the coal-fired power plant unit can maintain its power output without experiencing any derating, further demonstrating the reliability and effectiveness of our pump upgrades.
The project
Pushing Boundaries in Power Generation
Exterior view of the PLTU Rembang power plant from the access road
The client
KSB for PT. PLN Nusantara Power
The challenge
Interchangeability and Competitive Pricing
The solution
Carefully selected and fully integrated pump technology
Data | Facts | Figures
Products Used
CHTC
Horizontal high-pressure barrel-type pumps with radial impellers, single-entry and double-entry, multistage, with flanges or weld end nozzles to DIN and ANSI.
Products Used
CHTC
Horizontal high-pressure barrel-type pumps with radial impellers, single-entry and double-entry, multistage, with flanges or weld end nozzles to DIN and ANSI.
Products Used
CHTC
Horizontal high-pressure barrel-type pumps with radial impellers, single-entry and double-entry, multistage, with flanges or weld end nozzles to DIN and ANSI.