KSB in Indonesia: Keeping one of the most important power plants running
Supplying the backup pumps for the boiler feedwater applications at Cikarang Listrindo in Indonesia was a challenging task. Meant to take over for the main pumps during maintenance, these backup pumps are crucial to ensure the uninterrupted operation of our customer’s power plant.
Among the major challenges of this project were that the new pumps needed to fit into the existing mounting points and be able to work in unison with the existing pumps on site. Furthermore, the supplied backup pumps also needed to match the required operating conditions of the existing pumps.
Thanks to the in-depth know-how of our experts on site, KSB Indonesia was able to solve these and many more challenges, which came up during the process.
Supplying the backup pumps for the boiler feedwater applications at Cikarang Listrindo in Indonesia was a challenging task. Meant to take over for the main pumps during maintenance, these backup pumps are crucial to ensure the uninterrupted operation of our customer’s power plant.
Among the major challenges of this project were that the new pumps needed to fit into the existing mounting points and be able to work in unison with the existing pumps on site. Furthermore, the supplied backup pumps also needed to match the required operating conditions of the existing pumps.
Thanks to the in-depth know-how of our experts on site, KSB Indonesia was able to solve these and many more challenges, which came up during the process.
The project
Backing up the main pump of one of Indonesias TOP power plants
The HGC 5/11 pump at Cikarang Listrindo
The client
KSB for Cikarang Listrindo
The challenge
Matching the pumps at Cikarang Listrindo
The solution
KSB impresses with performance and price
Data | Facts | Figures
Products Used
HG
Horizontal radially split ring-section pump with radial impellers, single-entry or double-entry, multistage.